Monday, May 21, 2007

Slowly but surely.....

The bathroom got drywalled today. In addition, the base of the sink was installed. The paneling was all primed and painted and the spigot water thingy was installed--and it doesn't leak into the basement!!


Mark installed and hardwired all the smoke detectors--1 in the basement, 1 in each bedroom and 1 in the hall. I didn't take pictures of them though---you'll have to imagine what they look like.

Tomorrow will be sanding the mud on the bathroom walls--and then remudding them. I REALLY REALLY hope the bathroom gets done soon..it's makin me nuts!!

1 comment:

Cindy said...

Whee! It's starting to look like a BATHroom!