Sunday, June 3, 2007

Deck, Deck...DONE!

After working on the deck all week--it was finally finished on Thursday! I am in LOVE with it and really like that we moved the steps to the front. I DO wish we had left 1 set of side steps as well...but oh well.

Work in Progress:



Before:

After:
Before:After:Before:After:(I took this a little early--the lattice wasn't done yet--but you get the idea--it goes around the entire bottom of the deck--even under the stairs)

Pretty Kitchen floor

Little behind on my updates, huh?



Tuesday, Doug and John came to lay the vinyl in the kitchen. I took Kyle to get 2 teeth pulled and came back to very pretty new flooring!!



We couldn't walk on it until Wednesday, which meant the refrigerator was on the deck and we had to walk out front and around the house to get something out of it. It wasn't a pain at ALL! ;-) It's amazing how many times a day you need something out of the fridge. Luckily we thought to buy ice and keep it in a cooler in the house--so that helped. Tuesday night when we went to bed I had to drink bathroom water. *GAG* I swear it tasted like I was drinking out of a water hose!! ok. enough complaining.


Isn't the floor pretty?!? Here's Before and After:

I'm really, really in love with it. Everytime I round the corner to walk in there, I get surprised and feel a little burst of joy!! It's the little things, ya know!

Friday, May 25, 2007

Little bit done today..

The luan (I still don't know how to spell that--Kyle says this is right but the spell checker is flagging it--so who knows) was installed today and they will be back TUESDAY to install the vinyl. We're a little miffed because apparently, if you get anything on the luan the vinyl won't adhere to it. Ok, I have 2 kids and 2 animals and we can't eat out every meal from today thru Wednesday! They told us to just do what we need to and if anything gets on it they will sand it out. UGH! I don't know why they just didn't wait until Tuesday. so stupid.

Mark worked a little more on the deck and will be back Monday with John (a different John) to do more on the deck.

Thursday, May 24, 2007

Bathroom--DONE! (and other stuff)

OK..I can say the bathroom is officially done. They installed the faucet today and there is nothing else for them to do in there. It's very plain since there are no towel racks etc--but that will come in time. :-)

BEFORE:



AFTER:


The kitchen linoleum was removed today, the hole in the wall behind the refrigerator was dry-walled, the floor under the refrigerator was replaced with new sub-flooring, and the sink and new faucet were installed!


Hole behind fridge: Linoleum Removed:
New Sink



The Deck was all torn out (the are keeping all the floor joists etc--so it was just the top layer deck boards removed) and the new posts were cemented in.between those 2 posts is where the new steps will be!





All basement windows were removed and new glass block windows were put in--they are SO pretty. I didn't get a before picture of the windows and I wish I had.

This window was originally behind paneling--actually the whole room was paneled. Kyle removed all of that before the work started.

The cracks in basement walls were filled and the walls were all painted with "dry-lock". I can't believe the difference in having white walls down there!!!



Tomorrow, they will lay the luan (?) whatever it is..it's the floor they lay before they lay the vinyl. They will work more on the deck and I think they need to finish up the walls in the basement.










Wednesday, May 23, 2007

Moving right along...

The bathroom is now painted. The faucet needs to be installed in the bathroom sink--not sure what they are waiting for. But it's all done except for that. I ordered a shower curtain from Ebay and I need to get towel rods etc. and a new vanity light... But all the "core" items are there..except for the faucet. I REALLY wanna brush my teeth in the bathroom!!
Mark installed a new hot water heater--it's so pretty..the old one was all rusted and corroded and the one valve leaked.

They took off the deck rails and I am LOVING the clear view from my back door to the back yard. I asked Mark if we could move the stairs from the side of the deck to the front so I could keep that area open--he said that's no problem!!

Tomorrow, they will start tearing out the kitchen floor, tearing out the rest of the deck, tearing out basement windows and installing new glass block windows, and hopefully, install the bathroom faucet!!

Monday, May 21, 2007

Slowly but surely.....

The bathroom got drywalled today. In addition, the base of the sink was installed. The paneling was all primed and painted and the spigot water thingy was installed--and it doesn't leak into the basement!!


Mark installed and hardwired all the smoke detectors--1 in the basement, 1 in each bedroom and 1 in the hall. I didn't take pictures of them though---you'll have to imagine what they look like.

Tomorrow will be sanding the mud on the bathroom walls--and then remudding them. I REALLY REALLY hope the bathroom gets done soon..it's makin me nuts!!

Friday, May 18, 2007

Tubby Tub Tub

Doug and John got the bathtub and shower surround installed..the plumbing all connected and the shower head and water turn-on knobby thing installed.

(I guess I didn't get a picture of the shower surround--oh well--too lazy to do it now!)

Turns out that the room is a little bigger than the tub is long, so they had to build the wall up behind the one side of the shower and will have to drywall that whole wall so it matches up.


They put the water spigot faucet thing on the tub and when they turned on the water it leaked horribly into the basement. So, they took it off...re-glued something and said they will try it again on Monday once the glue has had time to set up. They said we can take a bath over the weekend but have to be careful because the water will shoot straight out of the pipe.


They sprayed Kilz primer on the paneling--and got some on my new floor--they swear WD-40 will take it up--it better!!


Mark finished wiring the outlets for the front and back of the house and then went to order the vinyl flooring for the Kitchen--it will be in Wednesday.


Everyone left around 4 for the weekend.


No showers for us this weekend. Sink baths and Sink hair washing are getting old really fast. At least I have a toilet though..so I won't complain TOO much!!